ADVERTISEMENT
Saturday, June 6, 2026
No Result
View All Result
The AZB More Than Just News
  • HOME
  • Latest News
  • Business
  • PAKISTAN
  • SPORTS
  • WORLD
  • E-Paper
  • SCI-TECH
  • BANKING
  • ARTICLES
  • OPINION
  • MORE
    • MOBILE
    • TELECOM
    • PERSONALITY
    • HEALTH / EDUCATION
  • HOME
  • Latest News
  • Business
  • PAKISTAN
  • SPORTS
  • WORLD
  • E-Paper
  • SCI-TECH
  • BANKING
  • ARTICLES
  • OPINION
  • MORE
    • MOBILE
    • TELECOM
    • PERSONALITY
    • HEALTH / EDUCATION
No Result
View All Result
Daily The Azb
No Result
View All Result
ADVERTISEMENT
Home ARTICLES

Residents of Deewangoal facing great hardships due to no bridge on yarkhun bridge.

News Desk by News Desk
April 17, 2023
Residents of Deewangoal facing great hardships due to no bridge on yarkhun bridge.
Share on FacebookShare on Twitter

UPPER CHITRAL : Residents of Deewan goal to Kox villages at Brep valley in upper Chitral are  facing great hardships due to no jeepable bridge on  Yarkhun river. Hundreds of students, ailing person, and patients are bound to cross a dangerous wooden temporary bridge on Yarkhun rive at Deewangoal village but it also washing away by river when water surface is raise.

Construction of a jeepable bridge was started at River in Deewangoal village  last year, but due to lack of funds, the work suspended and the bridge was left imcomplete. According to details, a suspension wooden  bridge was built across the river near Brep for the villages of Dewan Gol and Kozh etc. in 1994, but the bridge is now in a very dilapidated condition due to its old age. Karam Ali Saadi, a social worker of this area worked hard day and night for approval of  an iron bridge over the Yarkhun River near Diwan Goal to Kox villages situated  across the river, which consist of two thousand people. It was  approved by the then  Chief Minister of Khyber Pakhtunkhwa Mahmood Khan. The services of Khyber Pakhtunkhwa’s former special assistant to CM  for Minority Affairs, Wazir Zada Kalash, are also valuable. This bridge was  constructing under the supervision of Rural Development Department (RDD).

In September 2022 When former Chief Minister Khyber Pakhtunkhwa Mahmood Khan visited Brep valley when it was hit by tremendous flood  a resolution was presented to him demanding for  the construction of a bridge over the river near Dewan Gol. Karam Ali while explaining the details to our correspondent on phone. Saadi said that this bridge was not included in any scheme for ten months, but after much struggle, it got NOC and a fund of Rs. 26 million was approved for it. The work on this bridge was  started on May 12, 2022, but due to lack of funds, the work on it was stopped on July 5, 2022. Due to the lack alternate route or any other jeepable bridge , the people of these villages from Dewan Gol to Kozh have built a temporary wooden bridge over the river, which is destroyed due to the high water level in summer, and the people here have to walk by feet  six kilometers away. to cross an old swing wooden bridge to reach Brep. But this route is very dangerous because it passes through the foothills where heavy rocks and land sliding  are always falling. Karam Ali Saadi said that a few years ago, a student of 9th Class Suraya Bib was  died on the same road when she was going to school and a heavy stone fell on her head from the mountain. Suraya Bibi was the only daughter of her parents. Apart from this many other people have been hurt because of this.

Because there is frequent flooding in Breep due to avalanches and GLOF events, due to which road of  Yarkhun  and Brughal Valleys are also blocking and people strain  for days if a bridge is built on river for  Dewan Gol and Kozh on the other side of the river and if  road is constructed to the villages, it will also be an alternative road as a bypass for these valleys. The people of the area are very disappointed about the suspending  of the construction work of this bridge. In this regard, our representative contacted Misbahuddin, Assistant Director of RDD Department and asked the reason, he said that Rs. 26 Million had been approved for this purpose but fund was not released timely.  The fund was closed while the contractor has done much more than this fund. Our team traveled for nine hours continuously to reach this backward valley which is the first team of any media in this area.

Aliya Nawaz is a student of 9th class  who walks on this dangerous bridge to go to school by crossing Yarkhun River every day. She said that my school is across the river while my house is  situated on other side of the  river. I walk on the wooden bridge, but the water of the river is very fast and when we see the river below, our head is in danger of falling into the river. Alia Nawaz says that when the water level in the river is high. In summer it washes away the temporary bridge and then we walk six kilometers away and cross another swing (suspension)  bridge built for pedestrians to go to school in Brep.

Sarisha Mirza is also a second year student who goes to higher secondary school Brep by crossing the same dangerous bridge. Girls students  who are much younger than us go to school by walking on this bridge which can fall into the river from the source at any time. She said that in summer, when the water level is high, this temporary bridge also wash away, then we walk risky was beneath outskirt  of the mountain and cross a wooden swing bridge far away.

Amrina Inayat who is a first year student said that we go to school and college every day and we have to cross the river by crossing the bridge. Women and students have to face a lot of difficulties. In summer, when the water surface is raise , then this temporary bridge is also removed  and we go by another route, which is long and also very dangerous. She said that one of our relative  was passing that dangerous road and was seriously injured by a stone on his head. She said that when women fall ill here, people put them on cots and carry them on their shoulders and walk six kilometers by feet to bring them to the hospital. Besides  this, our people carry everyday items on  shoulders and carry them on foot

These students  demanded from the provincial government that the bridge which  was  left incomplete should be completed immediately by providing funds so that our difficulties can be reduced.

By Gul Hamaad Farooqi

News Desk

News Desk

Welcome to our web desk! We're a dedicated team of digital enthusiasts passionate about delivering timely and engaging content to our online audience.

Related Posts

Shehbaz Sharif Govt Cuts Petrol Price Again by Rs4 Relief
Headline

Shehbaz Sharif Govt Cuts Petrol Price Again by Rs4 Relief

June 5, 2026
Ukraine Drone Strikes Sink Five Ships in Sea of Azov Area
Headline

Ukraine Drone Strikes Sink Five Ships in Sea of Azov Area

June 5, 2026
Hezbollah Rejects US-Backed Israel Lebanon Ceasefire Deal
Headline

Hezbollah Rejects US-Backed Israel Lebanon Ceasefire Deal

June 4, 2026
US Celebrates Independence, Strengthens Pakistan Partnership
Headline

US Celebrates Independence, Strengthens Pakistan Partnership

June 4, 2026
Security Forces Kill Four Terrorists In KPK
Headline

Security Forces Kill Four Terrorists In KPK

June 4, 2026
Trump Claims Breakthrough in Iran Hormuz Talks
Headline

Trump Slams Republicans Over Iran War Vote

June 4, 2026
Dar congratulates new UNSC non permanent members elected
Headline

Dar congratulates new UNSC non permanent members elected

June 4, 2026
Satellite Images Show Impacts At US Air Base In Kuwait
Headline

Satellite Images Show Impacts At US Air Base In Kuwait

June 4, 2026
US Announces New Israel Lebanon Ceasefire Pilot Security Zones
Headline

US Announces New Israel Lebanon Ceasefire Pilot Security Zones

June 4, 2026
Trump DOJ Drops $1.8bn Political Fund Plan
Headline

Trump DOJ Drops $1.8bn Political Fund Plan

June 4, 2026
Next Post
Ultimate Sacrifices of Frontier Corps FC’s Martyrs to keep nation safe.

Ultimate Sacrifices of Frontier Corps FC's Martyrs to keep nation safe.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Are you human? Please solve:Captcha


Most Popular

No Content Available

Must Read

Nusserwanjee Building
Headline

U.S. CG, SEAS & IVS celebrate preservation of Karachi’s historic Nusserwanjee Building.

February 3, 2022
Nation is looking towards Chief Justice of Pakistan, Imran Khan
Headline

Nation is looking towards Chief Justice of Pakistan, Imran Khan

October 30, 2022
The Azb is a 24/7 online news platform that covers a wide range of topics including business, economics, technology, finance, travel, fashion, and lifestyle.

Quick Links

  • Home
  • About us
  • SCI-TECH
  • Live TV
  • Banking

Useful Links

  • Videos
  • Reviews
  • Advertorial
  • Photos
  • About us
  • Author
  • Home
  • Latest News
  • Partner
  • Privacy Policy
  • Russian Theatre Group Celebrates Fifth Anniversary in Pakistan.
  • Terms and Conditions
  • The Azb – More Than Just News
  • Contact

© Copyright 2024 theazb. All Rights Reserved.

No Result
View All Result
  • HOME
  • Latest News
  • Business
  • PAKISTAN
  • SPORTS
  • WORLD
  • E-Paper
  • SCI-TECH
  • BANKING
  • ARTICLES
  • OPINION
  • MORE
    • MOBILE
    • TELECOM
    • PERSONALITY
    • HEALTH / EDUCATION

© Copyright 2024 theazb. All Rights Reserved.